[1]
“GROUND IMPROVEMENT AS ALTERNATIVE TO PILING – EFFECTIVE DESIGN SOLUTIONS FOR HEAVILY LOADED STRUCTURES”, IEMJ, vol. 80, no. 1, Jun. 2020, doi: 10.54552/v80i1.17.