GROUND IMPROVEMENT AS ALTERNATIVE TO PILING – EFFECTIVE DESIGN SOLUTIONS FOR HEAVILY LOADED STRUCTURES. (2020). IEM Journal, 80(1). https://doi.org/10.54552/v80i1.17